Demo dataCompany, crew and site names are fictitious, and locations are offset by several km. Source: Vista export, 21 Sep 2026.
Shots blasted
113
124 records in total
Holes drilled
7,025
Across all recorded shots
Jobs
99
66 sites
Last blast
7 Apr 2026
167 days before the 21 Sep 2026 export
Shots with a recorded date
Holes drilled by year
1.5k1.1k7553770
- Holes drilled
By number of shots
Sites
Pine Basin Pit7 shots
May 2021 – Jul 2021
Cedar Divide Borrow5 shots
Apr 2014 – May 2014
Dry Flat Pit5 shots
Jan 2015 – Dec 2023
South Rim Site5 shots
May 2024 – Jun 2024
Cedar Coulee Quarry4 shots
Apr 2016 – Apr 2023
Latest shots
| Shot | Date | Site | Holes | Status |
|---|---|---|---|---|
| 26068.01 | 7 Apr 2026 | West Flat Pit | 72 | Blasted |
| 23058.01 | 31 Dec 2025 | Unassigned site | — | Blasted |
| 23057.01 | 31 Dec 2025 | Twin Bench Quarry | — | Blasted |
| 23008.01 | 31 Dec 2025 | Unassigned site | — | Blasted |
| 24093.05 | 24 Jun 2024 | South Rim Site | 54 | Blasted |
| 24093.04 | 30 May 2024 | South Rim Site | 10 | Blasted |
| 24093.03 | 24 May 2024 | South Rim Site | 9 | Blasted |
| 24093.02 | 22 May 2024 | South Rim Site | 8 | Blasted |